How to the steps of air curtain installation and maintenance.

내용의 테이블

Air Curtain Installation Steps:

  1. Determine the location where the air curtain will be installed.
  2. Measure the width of the doorway or opening where the air curtain will be installed.
  3. Select the appropriate size air curtain for the opening.
  4. Mount the air curtain securely above the doorway using the provided mounting brackets.
  5. Connect the power supply to the air curtain according to the manufacturer’s instructions.
  6. Test the air curtain to ensure it is functioning properly.

Air Curtain Maintenance Steps:

  1. Turn off power to the air curtain.
  2. Remove the cover of the air curtain.
  3. Clean the air filter using a soft brush or vacuum cleaner to remove dust and debris.
  4. Clean the interior and exterior of the air curtain with a damp cloth and mild detergent.
  5. Inspect the air curtain for any damage or wear and tear.
  6. Replace any damaged or worn parts.
  7. Reassemble the air curtain and turn the power back on.
  8. Test the air curtain to ensure it is functioning properly.

Here is a sheet to show the results of air curtain maintenance:

TaskNotes
Clean air filterFilter was clogged with dust and debris, but is now clean.
Clean interior and exterior of air curtainAir curtain was dirty, but is now clean and looks like new.
Inspect air curtain for damage or wear and tearNo visible damage or wear and tear was found.
Test air curtain functionalityAir curtain is functioning properly and blowing strong air flow.
Clean air filterFilter was slightly dirty, but is now clean.
Clean interior and exterior of air curtainAir curtain was slightly dirty, but is now clean.
Inspect air curtain for damage or wear and tearNo visible damage or wear and tear was found.
Test air curtain functionalityAir curtain is functioning properly and blowing strong air flow.

By keeping a log like this, you can track the maintenance performed on your air curtain and ensure that it is functioning optimally.

You also can contact CD AIRTECH engineer for the professional suggestion.

air curtain export from China

I am Jerry, cdairtech.com의 수출 영업 이사. 나는 에어커튼 공장에서 1년 이상 근무해왔습니다. 10 연령. 에어커튼에 관한 모든 문의사항은 저에게 연락주세요.

빠른 견적 요청

우리의 수출 관리자가 귀하에게 연락을 드릴 것입니다 1 일하는 날, 이메일에 주의해주세요: jerry.zhang@cdairtech.com

5 중국에 있는 직업적인 에어 커튼 공급자를 선택하는 원리

  1. 시간과 비용을 절약하세요

  2. 고품질 제품 찾기

  3. 시장 점유율을 높이십시오

  4. 애프터 서비스 시간 단축

  5. 보다 전문적인 고객 지원

negotiation